The Town of Cambridge takes in the suburbs of City Beach, Floreat, Wembley, West Leederville and parts of Jolimont, Daglish, Mt Claremont and Wembley Downs. With a population of around 27,000 the Town spans over 22 sq km of which 474 hectares are parks, gardens and reserves.
In order to reduce costs at both their Community Centre and Depot, the Town of Cambridge contact Infinite Energy for a solar solution.
In June 2017 we designed and installed two SunPower solar PV systems totally 31kW in capacity.
Together, the two systems will reduce the Town’s electricity spend by $13,270.
Company | Town of Cambridge |
---|---|
Location | Shenton Park |
Installation Date | 07 / 2017 |
Industry | Government & Local Council |
Solution | Solar Power System - System capacity 10.464kW
|
CO2- e. Abatement Per Year | 13 tonnes |
CO2 Equivalent Reduction | 49 trees saved per year |
Energy Output Per Year | 17,000kWh |
Solar % of Consumption | 26% |
Grid Electricity % of Consumption | 72% |
Projected Payback Period | 3.8 years |
Year 1 Return on Investment | 25% |
10 Year NPV | $9,675 |
Annual Savings | $3,470 |
Follow Us