In order to reduce on-site costs and make their business more competitive, CGC Engineering selected Infinite Energy to design, install and commission a 100kW commercial solar system at their Bassendean workshop.
In September 2017, we installed a 99.28kW SunPower system that will reduce their grid electricity usage by 51%, and save CGC Engineering over $35,000 in annual electricity bills.
Company | CGC Engineering |
---|---|
Location | Bassendean |
Installation Date | 09 / 2017 |
Industry | Manufacturing, Engineering & Transport |
Solution | Solar Power System - System capacity 99.28kW
|
CO2- e. Abatement Per Year | 126 tonnes |
CO2 Equivalent Reduction | 470 trees saved per year |
Energy Output Per Year | 161,330kWh |
Solar % of Consumption | 51% |
Grid Electricity % of Consumption | 49% |
Projected Payback Period | 3.0 years |
Year 1 Return on Investment | 33% |
10 Year NPV | $129,000 |
Annual Savings | $35,300 |