The City of Gosnells sought the installation of a suitable PV system to their Administration & Civic Centre in order to reduce operating costs of this facility, reduce the City's carbon footprint and to showcase to residents that sustainable energy infrastructure is affordable and cost effective. The City offered the tender to the WALGA preferred suppliers list.
Infinite Energy as a WALGA preferred supplier were successful in the tender process and instructed to supply and install a 39.78kW solar system to the centre.
Company | City of Gosnells |
---|---|
Location | Gosnells |
Installation Date | 11 / 2014 |
Industry | Government & Local Council |
Solution | Solar Power System - System capacity 39.78 kW
|
CO2- e. Abatement Per Year | 52 tonnes |
CO2 Equivalent Reduction | 192 trees saved per year |
Energy Output Per Year | 68,842 kWh |
Follow Us